The Business, Energy and Industrial Strategy (BEIS) Committee is currently examining the evidence that was received as part of its inquiry on financing energy infrastructure.
The inquiry was launched in the wake of investor decisions to halt work on new nuclear projects. These cancellations and suspensions illustrate the growing concerns among investors regarding the competitiveness of delivering new nuclear in the UK.
This is not the inquiry’s whole remit, however. It also looks at challenges in raising finance for renewables and energy storage, the attractiveness of the UK as a destination for energy investment, as well as the role of government in providing support and sharing risk.
[edit] Filling the ‘nuclear gap’
It is unlikely that there is any credible scenario for decarbonisation which does not involve new nuclear to some extent.
Nuclear provides reliable and long-term baseload power and is currently the single largest source of low-carbon electricity in the UK. The Nuclear Sector Deal, announced in June 2017, sets out an ambition to reduce the cost of new nuclear by 30% before 2030, while also committing government support for research on small modular reactors (SMRs).
But the role of renewables in terms of meeting generation needs, carbon reduction targets and delivering value for money is becoming ever more prominent.
The cost of renewables has fallen faster than many predictions and are expected to continue to fall as efficiencies are found and technology develops further.
ICE believes that the government must continue to support low-carbon technologies, including nuclear power, as part of a low-carbon energy mix, via long-term policy frameworks, support through mechanisms like Contracts for Difference (CfDs), as well as R&D funding where appropriate.
[edit] Support for storage
However, without affordable storage providing back-up capacity, the contribution of renewables in helping to replace carbon intensive fuels will be hindered.
ICE’s own State of the Nation 2018 report on infrastructure investment recommended that CfDs be extended to cover energy storage technology and be considered as part of the future repurposing of the UK’s heating network. This is particularly important when considering the growth in demand that electric vehicles will bring to the power network in the future.
ICE’s submission to the BEIS Committee’s inquiry can be accessed here.
[edit] About this article
This article was written by ice.org.uk David Hawkes, ICE Policy Manager. It previously appeared on the website of the Institution of Civil Engineers (ICE) and can be accessed here.Other articles on this website by the ICE can be found here.
[edit] Related articles on Designing Buildings
- Biomass.
- Carbon capture and storage.
- CHP.
- Community energy network.
- Domestic micro-generation.
- Earth-to-air heat exchangers.
- Energy harvesting.
- Energy storage.
- Energy storage - the missing piece?
- Feed in tariff.
- Five key themes for global infrastructure policy in 2021.
- Fuel cell.
- Geothermal energy.
- Geothermal piles
- Ground energy options.
- Ground source heat pumps.
- Large scale solar thermal energy.
- Making the most of renewable energy systems DG 531.
- Renewable heat incentive.
- Solar photovoltaics
- Solar thermal systems.
- Sustainable development: energy challenge.
- Sustainability.
- The Carbon Plan: Delivering our low carbon future.
- The Future of Electricity in Domestic Buildings.
- The future of UK power generation.
- Tidal lagoon power.
- Why the UK needs to support emerging tech like energy storage.
- Will we burn fossil fuels to power wind turbines in the future?
- Wind Energy in the United Kingdom.
- Wind turbine.
- Zero carbon homes.
- Zero carbon non-domestic buildings.
Featured articles and news
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.